Burtonwood, Warrington
Starlink Installation
This job was in Burtonwood, Warrington, on a housing estate that was previously the site of a major air force military base. Here we used our most common rig which comprised of a 12 x 12 inch galvanised wall bracket, 1.5 inch heavy gauge alloy mast, and special aluminium mount converter. All cabling was carefully channeled behind the downspout for a neat and tidy finish and the system was up and running in no time at all!
continue reading
Related Posts
This Starlink installation project was at Bowker Transport's headquarters in Bamber Bridge near Preston.
This multi-faceted project featured a Starlink install and a full networking system to solve the customer's wifi connection issues.
On this job in Tarporley, Cheshire, we reinstalled a Starlink Generation 2 system onto the main house and then beamed it over to a separate building using a point-to-point system.