Culcheth, Cheshire
Starlink Installation
This Starlink project was on an office building in a particularly windy location in Cheshire. It therefore needed a rock solid installation, so we used our tried and trusted ‘forever’ rig, consisting of 12 inch galvanised bracket, two inch steel mast and shelly clamp. This provides complete peace-of-mind and will stand up to even the harshest weather conditions for many years to come!
continue reading
Related Posts
On this Starlink installation in Atherton, we had the opportunity to try out a new powder coated alloy mount and we were really impressed!
This job was situated in a beautiful little village called Compstall, and it was our second Starlink installation of the day in the rural Stockport area.
This job in a small hamlet on the outskirts of Chester actually turned out to be a Generation 2 Starlink installation.