Mottram St. Andrew, Cheshire
Starlink Installation
This Grade II listed building in Mottram St. Andrew required a very discreet installation, so we needed to use a secure nine-inch bracket along with a minimum length, two-inch steel mast and shelly clamp. Nevertheless, the Starlink receiver had a perfectly clear line of sight and quickly became connected, providing superfast broadband speeds for the customer’s office!
continue reading
Related Posts
This Starlink installation project was at Bowker Transport's headquarters in Bamber Bridge near Preston.
This multi-faceted project featured a Starlink install and a full networking system to solve the customer's wifi connection issues.
This job was in Burtonwood, Warrington, on a housing estate that was previously the site of a major air force military base.


