West Yorkshire Dales
Starlink Installation
This project was 1000ft above sea-level, so the installation required heavy gauge 2 inch steel and the shelly clamp to successfully secure the Starlink mast in the strong West Yorkshire winds.
continue reading
Related Posts
This Grade II listed building in Mottram St. Andrew required a very discreet Starlink installation.
This commercial Starlink installation was in a windy location so needed a rock solid installation.
This Starlink installation featured an commercial antenna which weighs approximately twice as much as a typical domestic unit.